This $55 million, 65,000-square-foot mixed-use development was designed to create a vibrant, pedestrian-friendly downtown environment in San Juan Capistrano. C3 Civil Engineering provided a full suite of civil engineering services, including grading, storm drain, and utility design, along with FEMA processing and street improvements. The project integrates retail spaces with walkable public areas, contributing to the revitalization of the surrounding community.
This community-focused project brings together a new Performing Arts Center and municipal park to create both indoor and outdoor gathering and performance spaces on a 1.8-acre site. C3 Civil Engineering is supporting the ongoing entitlement process, working closely with the City and development team to refine plans and maintain project feasibility. The design emphasizes accessibility, flexibility, and long-term value for this nonprofit cultural destination.
Located adjacent to the San Juan Capistrano Performing Arts Center, the Forster Project is a 95-unit multifamily community designed to complement the surrounding cultural and residential environment. The 3.15-acre development features a range of amenities, including a pool, fitness center, community gathering spaces, and thoughtfully designed open areas. C3 Civil Engineering is supporting the project with civil design services that prioritize efficient site layout, connectivity, and seamless integration with neighboring developments.
Mission Place is a 1.7-acre retail and office development featuring a new building and structured parking in the heart of San Juan Capistrano. C3 Civil Engineering prepared comprehensive civil design plans, including grading, drainage, utilities, and adjacent street improvements. With the project currently under construction, the design supports efficient site use while incorporating water quality solutions and coordinated infrastructure improvements.
The Canopy at Great Park is a dynamic, $70+ million redevelopment transforming 22 acres into a vibrant retail and dining destination. The project includes an eclectic food hall, pedestrian pathways, water features, and preserved heritage trees, creating an engaging and walkable environment. C3 Civil Engineering supported both phases of development, delivering grading, utility, and infrastructure design while adapting to evolving tenant needs to ensure seamless integration across the site.
The Pacific Edge Hotel redevelopment is a $70 million coastal project that blends thoughtful design with complex site and regulatory considerations. C3 Civil Engineering is leading civil design efforts through the entitlement phase, working closely with ownership and the design team to integrate ongoing refinements into the project plans. Services include civil improvements, drainage and water quality design, coordination with Caltrans and local agencies, and preparation of technical studies and exhibits to support project approvals.
The French Hotel project is a 1.7-acre infill development that blends new construction with the preservation of historic site features in the heart of San Juan Capistrano. C3 Civil Engineering prepared preliminary grading and drainage plans, along with offsite water and sewer improvements, including extension of a high-pressure water main. The project required careful coordination to accommodate a tight site footprint while preserving historic adobes and relocating an existing barn. The development is currently undergoing environmental review, with construction documentation to follow upon approval.
This redevelopment project transforms an existing restaurant site into an enhanced dining destination with new building improvements and upgraded site infrastructure. C3 Civil Engineering provided precise grading and drainage design, along with site improvements including a retaining wall, trash enclosure, and pedestrian enhancements. The project required close coordination with the structural engineer to integrate retaining wall design within the constrained site. The project is currently under construction.
The Fox Block project is a multi-phase redevelopment designed to support increased activity within a growing commercial district in Fullerton. Phase one includes a new parking structure replacing an existing surface lot to expand parking capacity for nearby retail and entertainment uses. Future phases will redevelop adjacent properties into new restaurant and retail spaces, while reconfiguring a through-street into a cul-de-sac to improve pedestrian connectivity between surrounding destinations. C3 Civil Engineering provided grading, drainage, and street improvement plans to support the phased development and enhance overall site functionality.